* IMSS Funding: +$5000
 
* IMSS Funding: +$5000
 
* Paper: $35.50, 2007-11-01 (Joshua H)
 
* Paper: $35.50, 2007-11-01 (Joshua H)
* Pizza for sysadmin meeting: $20 2007-11-25 (Joshua H)
 
* Tools etc: $37 2007-11-26 (Joshua H)
 
** Toolbox: $10
 
** Wire ties: $10
 
** Wire Cutters: $9
 
** Emergency flashlight: $17
 
 
* Receiver: $138.55
 
* Receiver: $138.55
 
* Low-profile mounting brackets: 2007-11-28 $31.55
 
* Low-profile mounting brackets: 2007-11-28 $31.55
 
* 3 Galaxy 8600 Graphics cards: 2007-11-28 $429.11
 
* 3 Galaxy 8600 Graphics cards: 2007-11-28 $429.11
 +
* Projector ~$800 Feb 2008
 +
* Screen $100 Feb 2008
  
 +
Total: $1591.71 (Nov 30, 2007)
  
Total: $691.71 (Nov 30, 2007)
+
==MHF Funding Jan 2008==
 +
* Tape backup drive ~$1800
 +
* Tape backup server $1000
 +
* 3x 146GB SAS disks $180 each = $540
 +
 
 +
Total with tax: $3800
  
 
==MHF Funding, 2004==  
 
==MHF Funding, 2004==  

Revision as of 02:24, 8 February 2008

IMSS Funding FY 2007-2008

  • IMSS Funding: +$5000
  • Paper: $35.50, 2007-11-01 (Joshua H)
  • Receiver: $138.55
  • Low-profile mounting brackets: 2007-11-28 $31.55
  • 3 Galaxy 8600 Graphics cards: 2007-11-28 $429.11
  • Projector ~$800 Feb 2008
  • Screen $100 Feb 2008

Total: $1591.71 (Nov 30, 2007)

MHF Funding Jan 2008

  • Tape backup drive ~$1800
  • Tape backup server $1000
  • 3x 146GB SAS disks $180 each = $540

Total with tax: $3800

MHF Funding, 2004

  • September, 2004 MHF grant: $21,500
    • Expenditure on room remodeling: ~$5,000 (need to check records)
    • Expenditure on hard disks: ~$300 each x 12 = $3,600 (will need to double-check figure)
  • Balance as of 2007-06-10: $11,982.15
    • charon: -$1,463.10
    • hermes: -$3,276.48
  • Remaining: $7,242.57
    • hephaestus: -$1,122.25
    • poseidon: -$1,122.25
  • Remaining: $4,998.08
    • 9xMuses/Naiads (~$467 per system) - see Hardware Purchase): -$4203
    • 3xNVIDIA 8600 cards ($102.44 each): -$307
      • RMAed, total loss of money is $49.50 plus shipping cost, est. $60
    • 4xlow profile NVIDIA 8400 cards ($67.95 each): -$271.78
    • 10x1gb Memory ($36.59 each pair): -$365.89
  • 3xGigE cards from Caltech Wired: -$113