Financial Records

From UGCS
(Difference between revisions)
Jump to: navigation, search
(IMSS Funding FY 2007-2008)
(IMSS Funding FY 2007-2008)
Line 1: Line 1:
 
==IMSS Funding FY 2007-2008==
 
==IMSS Funding FY 2007-2008==
 +
* IMSS Funding: +$5000
 
* Paper: $35.50, 2007-11-01 (Joshua H)
 
* Paper: $35.50, 2007-11-01 (Joshua H)
 
* Pizza for sysadmin meeting: $20 2007-11-25 (Joshua H)
 
* Pizza for sysadmin meeting: $20 2007-11-25 (Joshua H)
Line 8: Line 9:
 
** Emergency flashlight: $17
 
** Emergency flashlight: $17
 
* Receiver: $138.55
 
* Receiver: $138.55
 +
* Low-profile mounting brackets: 2007-11-28 $31.55
 +
* 3 Galaxy 8600 Graphics cards: 2007-11-28 $429.11
  
 
==MHF Funding, 2004==  
 
==MHF Funding, 2004==  

Revision as of 23:44, 30 November 2007

IMSS Funding FY 2007-2008

  • IMSS Funding: +$5000
  • Paper: $35.50, 2007-11-01 (Joshua H)
  • Pizza for sysadmin meeting: $20 2007-11-25 (Joshua H)
  • Tools etc: $37 2007-11-26 (Joshua H)
    • Toolbox: $10
    • Wire ties: $10
    • Wire Cutters: $9
    • Emergency flashlight: $17
  • Receiver: $138.55
  • Low-profile mounting brackets: 2007-11-28 $31.55
  • 3 Galaxy 8600 Graphics cards: 2007-11-28 $429.11

MHF Funding, 2004

  • September, 2004 MHF grant: $21,500
    • Expenditure on room remodeling: ~$5,000 (need to check records)
    • Expenditure on hard disks: ~$300 each x 12 = $3,600 (will need to double-check figure)
  • Balance as of 2007-06-10: $11,982.15
    • charon: -$1,463.10
    • hermes: -$3,276.48
  • Remaining: $7,242.57
    • hephaestus: -$1,122.25
    • poseidon: -$1,122.25
  • Remaining: $4,998.08
    • 9xMuses/Naiads (~$467 per system) - see Hardware Purchase): -$4203
    • 3xNVIDIA 8600 cards ($102.44 each): -$307
      • RMAed, total loss of money is $49.50 plus shipping cost, est. $60
    • 4xlow profile NVIDIA 8400 cards ($67.95 each): -$271.78
    • 10x1gb Memory ($36.59 each pair): -$365.89
  • 3xGigE cards from Caltech Wired: -$113
Personal tools